Mart Hugh Posted October 20, 2019 Share Posted October 20, 2019 I am putting this ARTF together. On most other builds I have done (with one exception) I have always made sure that the control surface linkages are at 90 degrees to the hinge. The (somewhat vague) instructions for this kit, suggest that the linkages are parallel to the servo body, and indeed there appears to be a semicircular strengthening piece in the aileron for the control horn if I lay the linkage in line with the servo. However the hinge is not at 90 degrees to the sides of the servo. So - to all those who have already built this ARTF, which should it be. Linkages at 90 degrees to the hinge, or linkages in line with the servo body. Thanks. Quote Link to comment Share on other sites More sharing options...
Recommended Posts
Join the conversation
You can post now and register later. If you have an account, sign in now to post with your account.
Note: Your post will require moderator approval before it will be visible.