Jump to content

Phase 3 Squall Build Blog


Recommended Posts

Well i doubt this will be the longest blog ever but thought i would have a go a puttin it on here!! When i ordered it i went for all the bells and whistles of the 4 cell HP version with the thrust vectoring unit.
 
Well i got a call that the model was in the shop but the fan had been taken out to get replaced with the new fan. Plus the T V unit wasnt in yet!! Not to worry as the new arival into the family had taken up most of my time!!
 
I got the rest of the bits in 2 days ago all the ducted fan and motor plus the T V unit and rods.
 
So i thought it was about time to put it together!!

 
The first thing that struck me when i opened the box was the quality of the instructions. The colour photo step by step instructions left nothing out very impressed. 103 steps to build the plane plus a further 18 to fir the T V kit.

Anybody could build this from these instructions.
 
The model comes in 5 parts. Left and right wing fin fuselage and the intake. Alle the flyng controls are pre fitted with clear hinge tape making things very straight forward.
 
Link to comment
Share on other sites