Port wing build continues wing the addition of the lower wing 3.2mm spruce spar followed by the addition of the wing ribs which were only glues from the spar to the rear spar and don't forget to put the wedge in place so that the wing has the correct washout.

 

Once the ribs are glues form the sprue spar to the rear spar it's time to glue the ribs to the lower skin by placing wedges under the skin at each rib position so that it forms the correct wing section. once all ribs are fully glues add the top spruce spar and this is where I decided to add 2.4mm balsa shear webs between the top and bottom spruce spars and adjacent ribs. This won't add much weight but will substantially stiffen up the wing.

 

Also don't forget to add the 6mm doubler as shown on the plan at the dowel position.

 

Placed a servo in the wing trying to decide best position and made up a little box for it to sit into and will include a spruce former onto the top wing skin so as to screw the servo in securely.

Hope this blog helps anyone that decides to build the Andy Conway PSS BAe Hawk T1.

IMG_2800.JPG

IMG_2801.JPG

IMG_2802.JPG

IMG_2803.JPG

IMG_2804.JPG

IMG_2805.JPG

IMG_2807.JPG

IMG_2808.JPG

IMG_2811.JPG

IMG_2812.JPG

IMG_2816.JPG

IMG_2818.JPG

  • Like 1
Link to comment
Share on other sites

Port wing completed to the same level as the starboard wing. Don't forget to include the reinforcing inside the wing at the hinge positions, note I moved the outermost hinge position to the final wing bay.

 

Upper skins have been cut-out and glued together prior to fitting.

 

Have also started to pull together the required external decals for the BAe Hawk once it's completed.

Phil Cooke, Looks like it will be XX285.

IMG_2826.JPG

IMG_2827.JPG

IMG_2829.JPG

IMG_2830.JPG

  • Like 1
Link to comment
Share on other sites

Top skins now fitted to both port and starboard wings.

 

Note the pins don't go all the way through into the board only at the lead and trailing edge wing tips and the trailing edge root so that the correct washout is included using the wedge underneath as shown in the plan.

 

Added to the root fairings to both port and starboard engine intake, note that these are handed so make sure you know which way up these are. As previously mentioned these will be tacked onto the side of the fuselage for sanding to shape prior to covering as this wont be able once glued in place.

IMG_2831.JPG

IMG_2833.JPG

IMG_2834.JPG

IMG_2835.JPG

IMG_2837.JPG

IMG_2832.JPG

Link to comment
Share on other sites

Not much progress made unfortunately today.

What you can see is that I've marked the positions for where the Mylar hinges are to be put into both the wing and the ailerons and the tolls used to make sure these are centralised. Note the hinges need to be pinned in place after being glued in place using 2mm holes drilled through and a cocktail stick then pushed through the hole and glued in place.

 

Also photo showing the required rebate in the aileron and hole for the control mechanism to be inserted and bonded in place to stop any relative movement.

 

Mylar hinges are made to the required shape from sheet bought from Hobby King.

IMG_2850.JPG

IMG_2851.JPG

IMG_2852.JPG

IMG_2853.JPG

  • Like 1
Link to comment
Share on other sites

Wing build continues with marking and cutting the holes for the mylar hinges both in the wing and aileron. Mylar hinges are 12.5mm width by 30mm long has been found to work. Note these will also be pinned into place later as described previously.

Wingtips have been put against the end of the wings and marked so that these can be sanded to shape.

 

Leading edges have been attached to both wings and initial razor planing and sanding to meet bottom and top wing surfaces undertaken prior to completing the final shape.

 

Spruce strips have been added and glued in place so as to attach the servos into the wing.

IMG_2854.JPG

IMG_2855.JPG

IMG_2856.JPG

IMG_2857.JPG

IMG_2858.JPG

IMG_2859.JPG

IMG_2860.JPG

IMG_2861.JPG

IMG_2862.JPG

IMG_2863.JPG

IMG_2864.JPG

IMG_2865.JPG

IMG_2866.JPG

IMG_2867.JPG

  • Like 1
Link to comment
Share on other sites

Wing leading edges have been razor planed and sanded to shape as can be seen in the photo.

 

Mylar hinges have been inserted into the ailerons and 2mm holes drilled through and half a cocktail stick pushed through and glued in place and onece glue is dry the cocktail stick is trimmed and sanded flush. The same process will be repeated once the ailerons are fitted into the wing.

 

Wing tips have been sanded near enough to final shape and glued into place. Once glue is dry these will sanded to final shape.

 

Forward fuselage to be razor planed and sanded to near final shape.

 

This sanding part is the bit that I really hate.

IMG_2868.JPG

IMG_2869.JPG

IMG_2870.JPG

IMG_2871.JPG

IMG_2873.JPG

IMG_2872.JPG

IMG_2874.JPG

Link to comment
Share on other sites

Wingtips have been sanded level flush with the top and bottom skins, only the rounding of the edges still to be done.

 

Front fuselage has been fully sanded to shape or as near as, so much easier with it not being attached to the rest of the fuselage.

 

The square metal brass rod has arrived in the post today and can be inserted into the elevator later on today.

IMG_2877.JPG

IMG_2876.JPG

IMG_2875.JPG

Link to comment
Share on other sites

I thought I'd make the square brass tube and collets which need to be soldered together prior to inserting into the elevator as shown in the 1st photograph.

 

The main thing to remember here is to make sure the wife is out as you're going to need the gas hob to heat up the parts. The process is shown in the following photographs.

 

Firstly cut the square brass tube to length and put over the 10swg rod and then fasten a collet on the bottom and tighten up with the grub screw.

 

Put some tape over the other end of the square brass tube to stop it moving relative to the collet.

 

Put the collet and square brass tube over the gas ring putting the end over the blue tip of the flame and bring to temperature and then solder.

 

Results can be seen in the last photograph.

IMG_2883.JPG

IMG_2878.JPG

IMG_2879.JPG

IMG_2880.JPG

IMG_2882.JPG

  • Like 2
Link to comment
Share on other sites

Inserted elevator mechanism into elevator and bonded in place using epoxy.

 

Filled bigger hole with balsa wood piece and the smaller hole with model lite filler then sanded flush.

 

Remember to have the access to the grub screw on the lower surface and make sure you make a port and starboard elevator.

 

Will finish the elevators in glass cloth later once these have been checked for fitment with the aft fuselage side.

IMG_2884.JPG

IMG_2885.JPG

IMG_2886.JPG

IMG_2887.JPG

  • Like 1
Link to comment
Share on other sites

Elevator control rod cut to length from 10 swg rod as can be seen in the photos.

 

Work on the fuselage started again with putting in F7B. Note to mark as shown the area that needs to be glued as not the whole back. Cutouts for elevator rod to sit in put together noting you need a port and starboard. These will be glued onto the fuselage side later.

 

Front fuselage sides need to chamfered to a 45 degree angle as shown in the photos, this will allow the other balsa sides to be added flush later.

 

Final photo shows front fuselage being joined onto the aft after the chamfering has been finished.

IMG_2888.JPG

IMG_2889.JPG

IMG_2891.JPG

IMG_2890.JPG

IMG_2892.JPG

IMG_2893.JPG

IMG_2894.JPG

IMG_2895.JPG

IMG_2896.JPG

IMG_2898.JPG

Link to comment
Share on other sites

Fuselage build continues and it's starting to look more like a BAe Hawk.

 

Fuselage base was added and noting to chamfer the edges to 45 degrees before fitting makes it so much easier.

 

Fuselage sides from 6.4mm balsa have been added between F1 and F3 and applying chamfer to these before fitting will speed up the process of the build.

IMG_2899.JPG

IMG_2901.JPG

IMG_2902.JPG

IMG_2900.JPG

IMG_2902.JPG

IMG_2903.JPG

IMG_2904.JPG

IMG_2905.JPG

Link to comment
Share on other sites

Aft Fuselage pieces including the mounts for the elevator mechanism was put together and then installed on the respective fuselage side.

 

Once the elevator mounts were glued in place Frame F8 can be installed. Note at the top and along the back edge in the middle small areas need to be filled with a balsa insert due to errors in the drawing pack, nothing serious.

 

Final photo shows the 2 skins that need to be curved over the frames. On communicating with a number of PSS members the following methods could be used:-

1. Wetting the balsa in the area of the curve with hot water and using masking tape to hold in place till dry.

2. Wetting the balsa in the area of the curve with Ammonia and using masking tape to hold in place till dry.

3. Steaming the balsa in the area of the curve with hot water and using masking tape to hold in place till dry.

4. Cutting off the 2 skins and blanking the area instead.

I'm going to try the hot water technique today and if it doesn't work I'll cut them off and plank the area.

IMG_2907.JPG

IMG_2908.JPG

IMG_2909.JPG

IMG_2910.JPG

IMG_2911.JPG

IMG_2912.JPG

IMG_2913.JPG

Link to comment
Share on other sites

Well I decided to go with option wetting the balsa in the area of the curve with hot water and using masking tape and c;lamps to hold in place till dry.

 

I used the technique I was told to wet the balsa with hot water and leave for 15 minutes and then try the bending and holding.

 

This technique worked well but the plan that gave a developed shape of balsa required was wrong and you can see a 10mm space on both sides which I'll need to now plank.

IMG_2914.JPG

IMG_2915.JPG

IMG_2916.JPG

IMG_2917.JPG

IMG_2918.JPG

  • Like 2
Link to comment
Share on other sites

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.
Note: Your post will require moderator approval before it will be visible.

Guest
Reply to this topic...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

 Share

×
×
  • Create New...