Jump to content

The 2011 Christmas Build


Recommended Posts

Advert


Many thanks Jim and Weasel or as we say down here Jim Jaguar SS,I think Ive solved the main problem .Once I had figured out how to tie this flipping Turkey into a cookeable semblance and wrapped it in Foil I was away with everything else.The Sparrowhawk will be a doodle Night and the bird goes in the oven at 8.30 am
Link to comment
Share on other sites

Next 2 jobs were the engine mounts and tank.You remove a plate at the bottom of the fuselage held in by 2 screws.Then fit a tank support onto the inside bulkhead.Slide the tank in,hold it in place with a rubber band.Glue another support at the back of the tank.Engine mounts just screw into place,the captive nuts are already there. Next job is the under carriage





Link to comment
Share on other sites

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.
Note: Your post will require moderator approval before it will be visible.

Guest
Reply to this topic...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

 Share

×
×
  • Create New...